New Poll: Who is your VDI choice?
Upcoming Speaking Engagements
I’ll be participating in the Advanced Enterprise Virtualization seminars with Brian Madden and Eric Henderson in Los Angeles, Columbus and Chicago. Hope to see you there!
Citrix CTP Meeting
Recently, I was nominated to become a Citrix Technology Professional (CTP).
I just got back from two really informative days at the CTP meeting. The day started out with Mark Templeton welcoming us and we saw so many decision makers at both the business and product levels from Citrix over the two days that its very clear that Citrix puts a great deal of value on the CTP program.
The thing I really appreciated about it was the lack sales/marketing spin in their presentations. They presented each product factually with just a few slides with the understanding that it was more of “what do you think?” rather than “here’s the way it is”.
This was my first CTP meeting and it was really great to meet the other CTPs from all over the world. I’m looking forward to the next one.
What does it cost a Small Business to Implement Virtualization?
I get this question all of the time in one form or another, so I’m trying to determine hypervisor costs for a SMB as if I’m the owner looking to implement virtualization. This is an academic exercise, so pretend it’s your company and your money and you don’t have a particular vendor preference and you’re doing research online trying to determine apples to apples.
I usually don’t work the licensing side of the street, so I’m looking for feedback and correction if the costs are off the the mark. I’m using the vendor web sites and retail prices as if I were an SMB with no vendor connections.
Here’s the scenario:
From these requirements, we should have a really simple setup:
Two Hosts Connected to Shared Storage
Hyper-V
I went to the Microsoft Licensing assistance site to help me determine what I would need:
It said I need the Datacenter Edition because I was running more than 4 VMs per host.
Product Edition Advisor from Microsoft's Site
I worked my way through the tool and it recommended the Open Licensing with Software Assurance on the Server 2008 Datacenter version. The total was $8,094.
Not because the site really says so, but I think I need to add in the System Center with Virtual Machine Manager to be more on par with the other vendor’s management interfacesproducts.
I’m really not sure if I got all of the things included, but I bought Software Assurance with the Windows Server 2008 Datacenter, so I believe for Systems Center it will be $744 , plus I think I can use the Workgroup edition of Virtual Machine Manager for $505, plus I I think I’ll need CALs at $40 each of the 20 VMs for a total of $800. So for the management side of Hyper-V, I think the cost will be $2,049, plus whatever two more years will cost in maintenance.
I think I’ve met most of the requirements. Here is the link to the Hyper-V feature grid. But I couldn’t seem to select 3 years of support with their tools, so there will be more costs each year for maintenance. For one year I think the total is $10,143.
VMware ESX or ESXi
VMware has done a good job with packaging their products for small businesses. The Essentials Plus pack would be perfect at $4,905 except for some reason, it doesn’t include VMotion. So I guess we need to step up to the next level which is VMware vSphere 4 Advanced with 3 years platinum support for $3,675 each, for a total of $7,350 for the servers.
But wait, it’s only for 1 CPU, so I’ll need to contact someone to see how much a second one is to add to my order.
Only 1 CPU, I'll have to add another one.
To get VMotion and centralized management, I’ll need vCenter. They have vCenter Foundations for up to 3 hosts for $3,139 for a total of $10,489 for 3 years plus whatever a second physical CPU costs per physical host for the additional two years.
Citrix XenServer
Citrix has the technical product packaged pretty cleanly.
XenServer Enterprise has the technical features
XenServer with XenMotion is free, but I need High Availability and support for 3 years, so I need XenServer Advanced, Citrix Essentials Advanced with 1 year preferred support for $8,500.
I still need 2 more years of support
I still need 2 more years of support though. If it is linear, it should be $6,000 for 2 more years for a total of $14,500 to meet all of my requirements including 3 years of support.
Summary and To Do List
I don’t think I selected an unusual set of requirements in this as far as the hardware goes. I’ve seen plenty of dual CPU servers as the standard platform for virtualization projects. The 3 year support requirement didn’t seem to be out of line, but it seems to not be a frequent enough option for 2 of the 3 vendors to be in their online check out.
Microsoft – I need 2 more years of support costs. It wasn’t broken out where I could extrapolate it over 2 more years. I also would like for someone to validate that I have the right components and licenses for SCVMM.
VMware – I need to get the costs of adding the second socket CPU into the $7,530 server price
Citrix – I need to confirm that the support costs are $6,000 for two years
SQL server – I should note that both VMware vCenter and Microsoft’s Systems Center should be running with SQL server for production. Citrix XenServer does not require SQL server for XenCenter, so the cost of SQL Server can be deducted to the total for XenServer. For this exercise, I checked with CDW and SQL 2005 Standard was about $2,600.